Budgeting Issues in Project Management

Writer: Ad Ad
Ad Ad
Sep 19, 2023
2 min read

Project managers are challenged daily to maintain the project budget and avoid cost overruns and project delays. Project cost overruns are significant problems facing project management in large government establishments with complex projects. Cost overruns occur frequently during large system development projects (U.S. Government Accountability Office, 2013)

While project managers face the pressure of ensuring that projects meet budget, time, and performance targets, researchers continue to investigate the root causes of the cost overruns or project delays to develop appropriate estimation methods that address the problem. Many scholars attribute the cause(s) of cost overruns to unexpected risks and inaccurate estimation methods (Kwon et al., 2019). Estimating the project cost to completion during the planning phase is not an easy task and this is why a detailed reserve analysis is required to ensure that unidentified risks are covered in the contingency reserve (i.e., the known unknowns) while the unknown unknowns are covered in the management reserve. The contingency reserve is included in the cost baseline (which is under the project manager’s control) while the management reserve is not. The management reserve is only part of the entire project budget as it is not under the control of the project team (Project Management Institute, 2013). Lack of information or data makes budget planning difficult for project managers (Creedy et al., 2010)

Researchers have been able to determine how to plan for identified risks through improved and more accurate estimation methods. However, a lot still must be done to address unidentified risks, corruption or bribery, political interests, scope creep, and poor resource management. To this end, practical recommendations have been made to train project managers in cashflow management techniques and in the use of tools and techniques that allow the project’s progress to be tracked such as the Earned Value Management which calculates the project’s planned value, earned value, cost and schedule variances, or schedule and cost performance indexes etc.


References

Creedy et al (2010). Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), 528–537. Crossref.


Kwon et al (2019). “Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks.” Project Management Journal vol 50 (1) pgs 86–100. https://doi.org/10.1177/8756972818810963.


Project Management Institute (PMI). (2013). A guide to the project management body of knowledge (PMBOK® guide) – Fifth edition. Newtown Square, PA: Author.


U.S. Government Accountability Office. (2013). Reports to congressional committees, NASA assessment of selected large-scale projects (GAO-13-276SP). Washington, DC: Author.

 
 
 

Recent Posts

See All
Scope Creep

The scope of a project may present many challenges to the project manager if an adequate scope management plan is not in place. However,...

 
 
 

Comments


Join our mailing list for updates on publications and events

Thanks for submitting!

500 Terry Francine Street San Francisco, CA 94158

123-456-7890

© 2035 by The Thomas Hill. Powered and secured by Wix

bottom of page